Airport ICAO Code: | RJCC |
Airport IATA Code: | CTS |
Airport Type: | A - Civil |
Longitude/Latitude: | E 141° 41' 32.22"/N 42° 46' 30.72" 141.692283/42.775200 |
Elevation: | 82 ft / 24.99 m |
Location: | Chitose, Hokkaido (near Sapporo), Japan |
Magnetic Variation: | W 8°58.9' (2008-04) |
Time Zone: | UTC+9 |
Type | Name | Freq 1 | Freq 2 | Freq 3 | Freq 4 | Freq 5 |
---|---|---|---|---|---|---|
Approach Control | CHITOSE APP | 120.1 M | 362.3 M | 124.7 M | ||
Automatic Terminal Information Service | ATIS | 128.6 M | ||||
Clearance Delivery | CHITOSE CLNC DEL | 121.9 M | ||||
Departure Control | CHITOSE DEP | 124.7 M | ||||
Ground Control | CHITOSE GND | 121.6 M | ||||
Terminal Control Area | TCA | 127.7 M | 256.1 M | |||
Tower | CHITOSE TWR | 118.8 M | 236.8 M | 126.2 M |
Dimension: | 9840 x 200 ft / 2999.2 x 61.0 m |
Surface: | Asphalt, asphaltic concrete, tar macadam, or bitumen bound macadam. |
Runway 01L | Runway 19R | |
---|---|---|
Longitude: | 141.692825 / E 141° 41' 34.17" | 141.688106 / E 141° 41' 17.18" |
Latitude: | 42.761639 / N 42° 45' 41.90" | 42.788433 / N 42° 47' 18.36" |
End Elevation: | 68.0 ft | 82.0 ft |
Alignment: | 006.0 | 186.0 |
Slope: | 0.1 | -0.1 |
Touchdown Zone Elev.: | 68.0 | 82.0 |
Lighting System 1: | Sequenced Flashing Lights | Sequenced Flashing Lights |
Lighting System 2: | Touchdown Zone Lighting | Touchdown Zone Lighting |
Lighting System 3: | Centerline Lighting System | Centerline Lighting System |
Lighting System 4: | High Intensity Runway Lights | High Intensity Runway Lights |
Lighting System 5: | ALSF-1 | ALSF-1 |
Lighting System 6: | PAPI - Precision Approach Path Indicator | PAPI - Precision Approach Path Indicator |
Dimension: | 9840 x 200 ft / 2999.2 x 61.0 m |
Surface: | Asphalt, asphaltic concrete, tar macadam, or bitumen bound macadam. |
Runway 01R | Runway 19L | |
---|---|---|
Longitude: | 141.696458 / E 141° 41' 47.25" | 141.691744 / E 141° 41' 30.28" |
Latitude: | 42.761986 / N 42° 45' 43.15" | 42.788767 / N 42° 47' 19.56" |
End Elevation: | 62.0 ft | 82.0 ft |
Alignment: | 002.0 | 182.0 |
Slope: | 0.2 | -0.2 |
Touchdown Zone Elev.: | 63.0 | Unknown |
Lighting System 1: | Sequenced Flashing Lights | Sequenced Flashing Lights |
Lighting System 2: | Touchdown Zone Lighting | Centerline Lighting System |
Lighting System 3: | Centerline Lighting System | High Intensity Runway Lights |
Lighting System 4: | High Intensity Runway Lights | SALS or SALSF |
Lighting System 5: | ALSF-1 | PAPI - Precision Approach Path Indicator |
Lighting System 6: | PAPI - Precision Approach Path Indicator |
Caution - NEW CHITOSE and CHITOSE are two arpt connected by twy. NEW CHITOSE lctd SE with 2 parl Rwy 01-19. CHITOSE lctd NW with 2 parl Rwy 18-36. No snow removal btn 1300-2200 dly, exc PPR for ldg and tkof. |
Fuel - (NC-A, A1) |
Lighting - PAPI Rwy 01L MEHT 66', Rwy 01R MEHT 67', Rwy 19L MEHT 75', Rwy 19R MEHT 65'. Apch lgt bcn 19L on extn cntrln. |
Miscellanouis - 200' ovrn both ends of rwy. Rwy 01L/19R grooved. |
Noise Abadment - See FLIP PLANNING, AP/3. |